Guide Vantage · 2 min read

How long does it take to get Vantage running?

Your first scored pipeline output lands in two to three weeks. Full calibration, where the system reliably reflects how you make decisions, settles in around Month 3 and sharpens from there. Onboarding runs in four phases that progressively configure, train, and calibrate the system.

From contract signature to your first scored pipeline output is two to three weeks. Full calibration, where the system reliably reflects how you make decisions, settles in around Month 3 and keeps sharpening from there. The setup has four phases and each builds on the last.

Phase 1: Foundation (Week 1)

Fulcrum configures the technical architecture:

  • Tenant environment setup
  • CRM integration
  • Data source connections
  • Initial field mapping

At the same time, your team completes the Voice Corpus recording sessions — 3–5 hours across two or three scheduled calls.

Your time investment in this phase

  • Voice Corpus sessions: 3–5 hours total
  • One 60-minute architecture review call

---

Phase 2: Pattern library and scoring architecture (Week 2)

Fulcrum processes the Voice Corpus recordings and builds the initial pattern library:

  • ICP signals
  • Tier definitions
  • Disqualifier list
  • Scoring criteria structure

The pipeline architecture is built and tested against a sample of your historical records.

Your time investment

  • One 45-minute review of the draft pattern library to confirm it reflects your actual standard before the system goes live

---

Phase 3: First run and calibration (Weeks 2 to 3)

The system runs its first complete pipeline against your full CRM dataset. You receive:

  • The first scored output
  • The first correction queue

This is where you see the gap between what the system assumed and what you actually think — and the first corrections dramatically improve the next run.

Your time investment

  • First correction review: typically 45–60 minutes (longer than steady state because you are seeing the full gap for the first time)

---

Phase 4: Live system and full calibration (Month 3 and beyond)

After the first correction cycle, the system moves into steady state:

  • Weekly pipeline runs
  • Weekly brief
  • Weekly correction queue

Your ongoing commitment is 20–30 minutes per week.

Fulcrum does not declare Phase 2 (live retainer) until Phase 1 accuracy clears the kill criteria threshold:

  • 50% minimum accuracy
  • 60% target accuracy

If the first run accuracy is too low, the architecture is reviewed and adjusted before billing starts.

---

Connected questions

  • What does my team have to do differently once Vantage is running?
  • What should I expect in Month 1?
  • What CRMs does Vantage work with?

Related: What your team does differently · What to expect in Month 1 · What CRMs Vantage works with